The Challenges

Actual services undertaken are:-

Tasks Undertaken
Task 1: Assembled drawings and design data ; Task 2: Reviewed the designs and contract documents ; Task 3: Prepared report on review of the contract documents. Task 4: Assisted TAWSB with procurement of the contractor. Prepared tender documents and participated in the tendering and evaluation process.

Construction Supervision is on going: Tasks envisaged as follows:
Task 1: Issue construction documents; Task 2: Hand over Sites; Task 3: Detailed Supervision including certification of payments; Task 4: Prepare Completion Reports;  Task 5: Prepare Operation and Maintenance manuals.

Post Construction TasksTask 1: Ensure contractors attention to repairs; Task 2: Carry out final Inspection; Task 3: Carry out final Inspection and Handover; Task 4: Prepare “as built” drawings and final account.

Project Description

Client:TANATHI Water Services Board
Location:Kitui District, Eastern Province (Kenya)
Year Completed:February 2009 - February 2010