The Challenges
Waterproofing of concrete gutters to existing go-downs. Extensions to existing two storey, office block, steel roof trusses with IT5 cladding, rehabilitation of existing sewers for effluent and storm drainage. Rehabilitation of internal roads and parking and 0.5 km of access road using pre-cast concrete paving blocks.
The actual works done were; Design, detailing, preparation of working drawings and specifications for:
1. Steel roof trusses
2. Access roads
3. Internal roads and parking
4. Foundations, columns, beams and slab
5. Concrete gutters
6. Storm drain
7. Sewer drains