The Challenges

A six storey reinforced concreted framed building having a two level Basement parking and waste water treatment plant connected overhead tanks for water re-use.  Basement access through ramps, staircase and lifts.

The actual works done were; Design, detailing, preparation of working drawings and specifications for working drawings and bar bending schedules for all civil and structural works.

Project Description

Client:High noon Plaza Limited
Location:Karen, Nairobi City (Kenya)
Year Completed:June - December 2011