10 No. single storey hostels to accommodate 480 students, total floor area of 4000m2.  the buildings are laid on a terraced ground due to sloppy site, sewer reticulation and disposal to twin septic tanks of capacity 180m3, soak away pits and agricultural drains.  Electrical and mechanical installations.

The actual works done were; Design and detailing and preparation of working drawings specifications, bills of quantities for mechanical and electrical installations, sewer reticulation.  Topographical survey and profile survey for sewer line.

Project Description

Client:University of Nairobi
Location:Kikuyu Campus, University of Nairobi, Central Province (Kenya)
Year Completed:September 2003 - March 2004