The Challenges

Supervision of construction and maintenance of the following items:-

1. Construction of a 17m high earth dam.
2. Completion of the existing intake tower.
3. Extension of the existing diversion culvert in reinforced concrete.
4. Construction of spillway.
5. Construction of 500mm diameter steel raw water main to the nearby water treatment works.
6. Construction of conventional water treatment plant of capacity 16,000m³/day.
7. Supply and installation of high lift pumps complete with motors and electrical switchgear.
8. Construction of pump house.
9. Construction of chemical house.
10. Construction of administration block.
11. Construction of staff houses.
12. Construction of 200m³ elevated steel tank on 10m tower.
13. Construction of 450mm diameter steel rising main about 3,000m long complete with valves and fittings.
14. Construction of 11,000m³ storage tank in reinforced concrete at the existing MOW storage tanks site.
15. Construction of chain link fencing and steel gates.

Project Description

Client:National Water Conservation and Pipeline Corporation (NWCPC)
Location:Ngong Division, Kajiado District, Rift Valley Province (Kenya)
Year Completed:January 2009 - January 2011