The Challenges
1. Population estimates and forecast.
2. Establishment of water demands and sewage flows.
3. Design, preparation of preliminary sewerage drawings and location of four alternative treatment sites.
4. Generation of base maps and matching them with the existing development plans.
5. Preliminary assessment of the environmental baseline data.