The Challenges
A twelve storey reinforced concreted framed building having a basement parking area and sewer connection to adjacent trunk. Basement access through ramps, staircase and lifts. Design methodology included incorporation of earthquake and wind loading design.
Actual works done were; Design, detailing, preparation of working drawings and specifications for working drawings and bar bending schedules for all civil and structural works.