• Nairobi House H. H Abdi Towers

    Nairobi House H. H Abdi Towers

    A twelve storey reinforced concreted framed building having a basement parking area and sewer connection to adjacent trunk.  Basement access through ramps, staircase and lifts.  Design methodology included incorporation of earthquake and wind loading design. Actual works done were; Design, detailing, preparation of working drawings and specifications for working drawings and bar bending schedules for […]

  • Athi River Housing Development Project

    Athi River Housing Development Project

    1. Structural Engineering: A phased development incorporating 12 phase of construction of 3000 housing units comprising duplexes, maisonettes, 2 and 3 bedroom apartments.  Design methodology incorporating reinforced concrete frame structure load, bearing structures and structural steel design for 20m high water tank.  Structural design of sewer pumping station and all roadworks was accomplished. The actual […]

  • High Noon Office Development

    High Noon Office Development

    A six storey reinforced concreted framed building having a two level Basement parking and waste water treatment plant connected overhead tanks for water re-use.  Basement access through ramps, staircase and lifts. The actual works done were; Design, detailing, preparation of working drawings and specifications for working drawings and bar bending schedules for all civil and […]

  • Naivasha Junior (House) Nairobi School

    Naivasha Junior (House) Nairobi School

    Design and construction supervision of a three storey reinforced concreted framed building (dormitory) and waste water management system for the building. The actual works done were; Design, detailing, preparation of working/construction drawings and specifications for working drawings and bar bending schedules for all civil and structural works. Design of septic tanks, the sewerage line and […]

  • Co-operative Insurance Corporation (C.I.C) Plaza

    Co-operative Insurance Corporation (C.I.C) Plaza

    A seven storey reinforced concreted framed building having a sub-basement.  Parking area and sewer connection to trunk sewer 0.4 km away. The actual works done were; Design, detailing, preparation of working drawings and specifications for working drawings and bar bending schedules for all civil and structural works.

  • Alterations and Extensions to Accident and Emergency Department

    Alterations and Extensions to Accident and Emergency Department

    Alterations to ground floor, addition of one floor, area 1900m2 per floor, reinforced concrete flat roof slab, laying of light weight screed to falls and waterproofing using bituminous based EPDM. The actual works done were; Design and detailing of Columns, access R.C> ramp, stair case, beams and roof slab.  Preparation of working drawings and bar […]

  • Refurbishment of Caltex Service Station

    Refurbishment of Caltex Service Station

    Rehabilitation of existing facilities, forecourt area involving 3000 m3 of earthworks, hand packed stone base plus cabroworks surfacing, new steel canopy and pump islands. Acceleration/deceleration lanes. The actual works done were; Design review, preparation of working drawings and Tender documents. Construction supervision and overall contract management on behalf of client. Wed by construction supervision and […]

  • Hostels at College of Education and External Studies

    Hostels at College of Education and External Studies

    10 No. single storey hostels to accommodate 480 students, total floor area of 4000m2.  the buildings are laid on a terraced ground due to sloppy site, sewer reticulation and disposal to twin septic tanks of capacity 180m3, soak away pits and agricultural drains.  Electrical and mechanical installations. The actual works done were; Design and detailing […]

  • Headquarters for Uchumi Supermarkets Limited

    Headquarters for Uchumi Supermarkets Limited

    Waterproofing of concrete gutters to existing go-downs.  Extensions to existing two storey, office block, steel roof trusses with IT5 cladding, rehabilitation of existing sewers for effluent and storm drainage.  Rehabilitation of internal roads and parking and 0.5 km of access road using pre-cast concrete paving blocks. The actual works done were; Design, detailing, preparation of […]

  • Kenol Service Station and Restaurant (Makutano)

    Kenol Service Station and Restaurant (Makutano)

    The project involves the reconstruction works on the existing service station to have a restaurant, lubrication/wash bay, new station building and steel canopy/pump islands. The project involves excavation to spoil of 7000 m3 of Earthworks and backfilling with approved borrow material, hand packed stone bitumen carbroworks surfacing, 0.4 km of approach roads including deceleration/acceleration lanes. […]