• irr13

    Training of District / SISDO Irrigation Engineers

    Guidance of District Irrigation Engineers in the design and preparation of tender documents for Mukuria–Kiambogo, Mwethya Muveleki, Ciambaraga and Mbanya Irrigation schemes. Mbanya Irrigation schemes, Makueni District: Guidance of  makueni district irrigation engineer in the design and preparation of tender documents for a gravity dam intake work, piped water main conveyance system and open canal […]

  • Elnino Emergency Project - AFD Component

    Improvement of Rural Food Security Phase III Project

    he principal purpose of this Technical Feasibility Study was to determine feasible sub-projects based on the available information supported by field surveys. The feasibility report analyzed past, present and future demands for services. The study examined the existing systems, the degree to which these systems meet all demands in the sub-project areas and the possible […]

  • Housing Development in Athi River

    Housing Development in Athi River

    Design of Sewer System incorporating pipe networks to 3000 Units linked to main sewerage line and pumping station consisting of 300m diameter rising main to transfer the waste water to an existing sewer line 800m away. The actual services provided were; 1. Waste water design of Sewer system incorporating pipe. 2. Preparation of bills of […]

  • The Study on Establishment of a Sewerage System Database in Kenya

    The Study on Establishment of a Sewerage System Database in Kenya

    Establishment of an update technical, financial and institutional database of the sewerage system in 29 Cities and Towns in Kenya that have a sewerage system (Nairobi, Mombasa, Kisumu, Bungoma, Busia, Eldoret, Embu, HomaBay, Isiolo, Kakamega, Kapsabet, Karatina, Kericho, Kiambu, Kisii, Kitale, Limuru, Machakos, Mavoko, Muranga, Meru, Naivasha, Nakuru, Nanyuki, Nyahururu, Nyeri, Thika, Voi and Webuye), […]

  • Mwingi Town Sewerage System

    Mwingi Town Sewerage System

    Population estimates and forecast. Establishment of water demands and sewage flows. Design, preparation of preliminary sewerage drawings. Location of alternative treatment sites (4). Generation of base maps through the use of aerial photographs. Matching of base maps with the existing development plans. Preliminary assessment of the environmental baseline data.

  • Mwingi Town Sewerage System

    Rehabilitation of Water Facilities in Marsabit Town

    Design, tender documentation, bid evaluation, on site supervision and contract management. This was a World Bank funded project through Drought Recovery Programme, Office of the President. The project involved the rehabilitation of water facilities, which comprised of intake works, Treatment works, Transmission main distribution system, Storage tank and Pressure zoning.

  • Meter Reading System - Kitale Municipal Council

    Meter Reading System – Kitale Municipal Council

    Identification of meter reading routes, preparation of consumer connection cards, updating of consumer main list (2847 water consumer connections), meter reading books, meter reading zones, monthly meter reading cycles, training of meter readers and billing clerks. Developed and supervised the implementation of an improved revenue collection system and a revised meter reading and billing systems […]

  • Meter Reading System - Nyahururu Municipal Council

    Meter Reading System – Nyahururu Municipal Council

    Identification of meter reading routes, preparation of consumer connection cards, updating of consumer main list (2041 water consumer connections), meter reading books, meter reading zones, monthly meter reading cycles, training of meter readers and billing clerks. Developed and supervised the implementation of an improved revenue collection system and a revised meter reading and billing systems […]

  • Elnino Emergency Project - AFD Component

    Elnino Emergency Project – AFD Component

    Live technical auditing of the engineering works, relevant documentation and quality assurance. 1. Audit review of the Water Supply Final Inception Report. 2. Audit review of the Appraisal Reports, preliminary designs and Bid documents (book of drawings, specifications and bill of quantities) for the rehabilitation of the following water projects: PW50 Kigumo and Muranga; PW51 […]

  • Elnino Emergency Project - IDA/ADB Component

    Elnino Emergency Project – IDA/ADB Component

    Management Audit: Review of the sectoral progress reports from PMU; review of monthly progress reports from Consultants; comparative analysis of actual progress against the original plan; status of the financial management system (power works); review of the interim payment certificates for both the contractors and consultants and preparation of the audit report. Report on the […]