• Technical Assistance to Implementation of Rift Valley Water Supply & Sanitation Programme

    Technical Assistance to Implementation of Rift Valley Water Supply & Sanitation Programme

    The actual services provided were:- 1. Reviewing how the proposal has presented an overview of water, sanitation and hygiene conditions in the community (present and future service levels). 2. Reviewing of the CPC process on how it has brought about full community involvement, resulting in a sense of ownership, and willingness and ability to maintain […]

  • Rift Valley Water Supply & Sanitation Project

    Rift Valley Water Supply & Sanitation Project

    The actual services provided were:- 1. Design of an accounting system – this will involve the identification of the user needs, selection of an appropriate accounting system to meet these needs and documentation of the procedures to be used in the design. 2. Developing of an Accounting and Financial Procedures Manual. 3. Training of users […]

  • Migori Water & Sanitation Project Phase II

    Migori Water & Sanitation Project Phase II

    The actual services provided were:- 1. Outputs of the TA support includes firstly demonstration of a strategy for promoting management based on economical principles and transferring responsibilities of financing water supply development to consumers, as individuals and in their corporate structures. Secondly it will lead to improved performance of water supply systems in targeted consumers’ […]

  • Consultancy on River Water Users Association

    Consultancy on River Water Users Association

    The aim was to establish the more equitable distribution of water between users, as well as to designate grazing areas and water access points for pastoralist.  These are particularly important during drought periods, they become conflict flashpoints. 1. To establish registered river water users associations which meets on a regular basis and have developed dialogue […]

  • he Baseline Survey on Proposed Project for Formulation of an Integrated Watershed Management Plan for Nyando River Basin

    he Baseline Survey on Proposed Project for Formulation of an Integrated Watershed Management Plan for Nyando River Basin

    the actual works done were:- 1. Collection and collation of available past study reports, data and information. 2. Establishment of approach and methodology for the baseline survey. 3. Preparation and presentation of the inception report. 4. Reviewed the situation of the Nyando River Basin based on available statistical data and information as well as documents […]

  • Kenya Water & Sanitation Programme (KWSP)

    Kenya Water & Sanitation Programme (KWSP)

    the actual works done were:- 1. Preparation of specifications for Financial Accounting Software to satisfy reporting needs both for the management of the respective institutions and for the KWSP contributors. 2. Preparation of Financial Management Systems Manuals for WSBs, WRMA and KWSP. 3. Preparation of specifications for and procurement documentation relating to the procurement of […]

  • Review of the Proposed Water Sector Reform Strategy

    Review of the Proposed Water Sector Reform Strategy

    Provided peer review services on the zero draft of January 2003 of the proposed National Water Services Strategy (NWSS) and National Water Resources Management Strategy (NWRMS).

  • Itumbe Tea Factory

    Itumbe Tea Factory

    Design, preparation of working drawings, specifications and construction supervision. 1. Water supply: In-take structures, Treatment works at intake site, 4.0 Km of 100mm GI rising main, 100m3 capacity of 10.0m high elevated steel tank. 2. Factory effluent Treatment and disposal. 3. Structural works: 31.0m x 63.0m withering building comprised of steel roof and structural steel […]

  • Nairobi City Water Distribution Networks

    Nairobi City Water Distribution Networks

    The actual services involved: 1. Assessment of the adequacy of the distribution system and the feasibility of the borehole integration. 2. Formulation of concept and policy on use of private boreholes. 3. Feasibility study of network modification options, re-design of city distribution zones, detailed designs and preparation of tender documents for the distribution modification and […]

  • Kiserian Dam Construction Supervision

    Kiserian Dam Construction Supervision

    Supervision of construction and maintenance of the following items:- 1. Construction of a 17m high earth dam. 2. Completion of the existing intake tower. 3. Extension of the existing diversion culvert in reinforced concrete. 4. Construction of spillway. 5. Construction of 500mm diameter steel raw water main to the nearby water treatment works. 6. Construction […]