• Construction Supervision of Wote Water Supply

    Construction Supervision of Wote Water Supply

    Actual services undertaken are:- Tasks Undertaken Task 1: Assembled drawings and design data ; Task 2: Reviewed the designs and contract documents ; Task 3: Prepared report on review of the contract documents. Task 4: Assisted TAWSB with procurement of the contractor. Prepared tender documents and participated in the tendering and evaluation process. Construction Supervision […]

  • Endependent Technical Evaluation for ECHO CARE Watsan Project

    Endependent Technical Evaluation for ECHO CARE Watsan Project

    This evaluation was a descriptive research. The following were included in the process: 1. Review the Program documents (proposals, progress reports,) so as to be thoroughly conversant with the projects. 2. Field work (primary data collection). 3. Development of the assessment tools (Observation, Assessment and Focused Group Discussion questions) to be used in the field […]

  • Athi River Basin Water Resources Development Study

    Athi River Basin Water Resources Development Study

    1. Data collection (potential sedimentation of the proposed dam will be checked, availability of construction material, the topography of the dam site, the reservoir permeability and the spillway location). 2. Laboratory tests of the existing water quality data on Athi River Basin Water Resources Development Study for minimum criteria on bacteriological and chemical quality. 3. […]

  • Kiserian Dam Design

    Kiserian Dam Design

    1. Review of project and general study of the project area through site visits and review of Client’s reports. 2. Design of 63m long access bridge to intake tower. 3. Design of 18m high dam. 4. Flood analysis for design of spillway at 1/500 and 1/1000 return period. 5. Design of site roads approximately 5km. […]

  • Thwake Multipurpose Dam Design

    Thwake Multipurpose Dam Design

    The actual work done were; 1. Review of project and general study of the project area through site visits and review of Client’s reports. 2. Preparation of mapped contours for the project site. 3. Geotechnical investigations. 4. Design of 300m access bridge to intake tower. 5. 40 km long overhead electricity transmission lines to Wote […]

  • Supervision of Construction Works for Rehabilitation & Augmentation of Water Supply for Six Water Services Providers

    Supervision of Construction Works for Rehabilitation & Augmentation of Water Supply for Six Water Services Providers

    Supervision of the construction of the following items: 1. Lamu:8.5 km DN 200/150 mm steel transmission main; 225 m3 reservoir and office block; 9 km DN 315/90 mm uPVC distribution; Pumps and switchgear at the pumping station. 2. Hola: Intake pontoon and package WTP; 1.5 km DN 150 transmission main; 4 km DN 225/63 distribution; […]

  • Housing Development in Athi River

    Housing Development in Athi River

    Design of water supply system including fire fighting, steel elevated water tank, boreholes and associated accessories to 3000 housing units, schools and commercial centre. The actual services done were as follows; 1. Water supply design of piping networks and detailing. 2. Preparation of bills of quantities and engineer’s estimate for tendering. 3. Preparation of specifications.

  • Rehabilitation of Water Facilities in Marsabit Town

    Rehabilitation of Water Facilities in Marsabit Town

    Environmental impact assessments at the water sources and point of consumption. Health impacts to be felt in Marsabit Township as a result of lack of sewage treatment facilities in line with the improved water supply to Marsabit were addressed. Where negative impacts envisaged, the necessary mitigation measures were incorporated.

  • eia6

    Small holder Irrigation Schemes in Districts Bordering Lake Victoria

    Environmental impact assessment study for 21 existing and proposed irrigation projects under the auspices of the Demand Study for Smallholder Irrigation Schemes in Districts bordering Lake Victoria. The Study covered an inventory of the aspects of environmental impact assessment that are likely to be caused by smallholder rice irrigation development projects along the Lake Victoria […]

  • Mwingi Town Sewerage System

    Mwingi Town Sewerage System

    1. Population estimates and forecast. 2. Establishment of water demands and sewage flows. 3. Design, preparation of preliminary sewerage drawings and location of four alternative treatment sites. 4. Generation of base maps and matching them with the existing development plans. 5. Preliminary assessment of the environmental baseline data.