Water and Sanitation

  • Mwingi Town Sewerage System

    Rehabilitation of Water Facilities in Marsabit Town

    Design, tender documentation, bid evaluation, on site supervision and contract management. This was a World Bank funded project through Drought Recovery Programme, Office of the President. The project involved the rehabilitation of water facilities, which comprised of intake works, Treatment works, Transmission main distribution system, Storage tank and Pressure zoning.

  • Meter Reading System - Kitale Municipal Council

    Meter Reading System – Kitale Municipal Council

    Identification of meter reading routes, preparation of consumer connection cards, updating of consumer main list (2847 water consumer connections), meter reading books, meter reading zones, monthly meter reading cycles, training of meter readers and billing clerks. Developed and supervised the implementation of an improved revenue collection system and a revised meter reading and billing systems […]

  • Meter Reading System - Nyahururu Municipal Council

    Meter Reading System – Nyahururu Municipal Council

    Identification of meter reading routes, preparation of consumer connection cards, updating of consumer main list (2041 water consumer connections), meter reading books, meter reading zones, monthly meter reading cycles, training of meter readers and billing clerks. Developed and supervised the implementation of an improved revenue collection system and a revised meter reading and billing systems […]

  • Elnino Emergency Project - AFD Component

    Elnino Emergency Project – AFD Component

    Live technical auditing of the engineering works, relevant documentation and quality assurance. 1. Audit review of the Water Supply Final Inception Report. 2. Audit review of the Appraisal Reports, preliminary designs and Bid documents (book of drawings, specifications and bill of quantities) for the rehabilitation of the following water projects: PW50 Kigumo and Muranga; PW51 […]

  • Elnino Emergency Project - IDA/ADB Component

    Elnino Emergency Project – IDA/ADB Component

    Management Audit: Review of the sectoral progress reports from PMU; review of monthly progress reports from Consultants; comparative analysis of actual progress against the original plan; status of the financial management system (power works); review of the interim payment certificates for both the contractors and consultants and preparation of the audit report. Report on the […]

  • Water Supply & Sanitation Sector Performance Evaluation (DIDC)

    Water Supply & Sanitation Sector Performance Evaluation (DIDC)

    The evaluation study consisted of a field survey and writing up of a report on the findings from field data supplemented with a desk review of relevant documents. The study utilised both qualitative and quantitative data through a participatory approach based on (i) key informant interviews by use of data collection instruments, (ii) field visits […]

  • Managing Water for African Cities

    Managing Water for African Cities

    The services of the Technical Adviser were to guide the NCC staff to develop a water demand management strategy for city of Nairobi and oversee the subsequent implementation of the project. The study had the following outputs in the form of reports: Situational Analysis, Pilot Study Area Report City Hall and City Hall Annex, Kampala […]

  • Rehabilitation of Water Facilities at Onana-Funyula Water Supply

    Rehabilitation of Water Facilities at Onana-Funyula Water Supply

    1. Involved in the review of tender documents: contract documents, instructions to bidders, specification, bill of quantities and engineering drawings. Made improvements in the documents after site assessment of the locations of the facilities. 2. Undertook the preparation of the Tender Evaluation Report whose content included preliminary evaluation; commercial evaluation; technical evaluation;post-tender correspondences; and conclusion […]

  • Operation & Maintenace Management Manuals

    Operation & Maintenace Management Manuals

    Prepared seven Management Manuals for the Operation and Maintenance of water supply projects comprised of the following: 1. Water Sources and Treatment Works: Water sources, water treatment, chemical operations, and surveillance chart; 2. Pumping Facilities: Pumping operations; pump and motor maintenance (operational) workshop; maintenance procedure; and health and safety; 3. Distribution and Pipeline Appurtenances: ; […]

  • Operation & Maintenance Manuals

    Operation & Maintenance Manuals

    The works involved preparation of Operation and Maintenance Manuals for operational water supply projects within the Kefinco Programme (Kakamega, Webuye, Busia Mundika, Maseno, Chesakaki, Maturu Luandeti, Kaimosi, Mumias, Kapsakwony, Mukumu Complex, Eregi, Ukwala, Sega, Malava, Butere, Kabuchai, Sio Port and Funyula-Nangina water supplies). These projects comprised of pumping and gravity supplies, conventional treatment works and […]